CUESTIONARIO Total Productive Maintenance and Reliability-Centered Maintenance

 Answer the questions below with the information of the text  

                                                                                                    

Chapter 13 - Total Productive Maintenance and Reliability-Centered Maintenance

Publisher Summary

This chapter discusses total productive and reliability-centered maintenance (RCM) at Beta International. The first step in combining total productive maintenance (TPM ) and RCM principles is to perform a streamlined failure modes and effects analysis (FMEA)/ RCM analysis of a given production line, that is, at a business system level. The FMEA/RCM portion of the analysis defines a functional failure as anything that causes loss of production capacity or results in extraordinary costs. It is focused on failure modes, frequencies, and effects and is extended to identify those failure modes that would be readily detected and prevented by proper operator action. It also details those failure modes and effects that require more advanced methodology and techniques, such as predictive maintenance, better specifications, better repair and overhaul practices, and better installation procedures to avoid the defects from being introduced in the first place. The next step is to apply TPM principles related to restoring equipment to like-new condition, having operators provide basic care in tightening, lubricating and cleaning, and applying more effectively preventive and predictive techniques. The company found that combining TPM and RCM actually led to a better process, improvements in teamwork, and cooperation at the production level; leading to improved performance, and output, and lower operating costs.

Available at https://www.sciencedirect.com/science/article/abs (Acceso 16 de julio, 2024)

CUESTIONARIO    

1.¿Qué se debe realizar en primer lugar para combinar los principios de TPM y RCM en Beta International?

2.¿Qué se define como una falla funcional en el contexto del análisis FMEA/RCM?

3.¿En qué se enfoca el análisis FMEA/RCM?

4.¿Qué tipos de metodologías y técnicas avanzadas se mencionan para prevenir ciertos modos de falla?

5.¿Qué prácticas básicas deben realizar los operadores según los principios de TPM?

6.¿Qué beneficios encontró Beta International al combinar. los principios de TPM y RCM?

7.¿Cómo afecta la combinación de TPM y RCM al trabajo en equipo y la cooperación en el nivel de producción?

8.¿Qué se entiende por restaurar el equipo a una condición "como nueva" según los principios de TPM?

9.¿Qué se debe hacer para evitar que se introduzcan defectos desde el principio, según el análisis FMEA/RCM?

10.¿Cómo impacta la combinación de TPM y RCM en los costos operativos de Beta International?